THE KEEL LAYING OF LILY PG


 

The Keel Laying of Lily PG, a 7,000 Dwt Chemical/Oil tanker with stainless steel cargo tanks, being built for Pritchard Gordon Tankers Ltd (Hull Nr.115) has been performed successfully on 12th of September 2017, in accordance with the production calendar and with the participation of the Owners. The Construction schedule of the Ship is continuing as planned. Being the second ship that RMK MARINE has been building for PGT, Lily PG is a development of first ship ROSE PG with an increased LoA (Length Overall) and furnished with stainless steel cargo tanks.
13.09.2017