2023

2023
RMK MARINE–NEOLINE ARMATEUR CONTRACT BECAME EFFECTIVE

RMK MARINE- Neoline Armateur Shipbuilding contract for the construction of a 136 m Sailing Ro-Ro Vessel  became effective on 6th January 2023.

 


2022

2022
RMK MARINE delivered POINTE DE CAUX successfully to its French client Sogestran Shipping on 31st of August 2022.

RMK MARINE delivered POINTE DE CAUX successfully to its distinguished French client Sogestran Shipping on 31st of August 2022.

RMK MARINE  launched successfully the 4,700 DWT chemical tanker Pointe de Caux on 24th March 2022.


2021

2021
The Keel Laying of Pointe De Caux was performed successfully.

The Keel Laying of Pointe de Caux, has been performed successfully on 25th of August 2021.

The steel cutting activity of Pointe De Caux Project (NB 123, being built for Sogestran Shipping was performed in RMK MARINE on 02.June 2021.

According to the Kincentric´s Best Employers 2020 survey, RMK MARINE has been awarded with "Turkey´s Best Employer" award within 24 companies in Turkey.

The Classic Boat´ magazine nominated the 10-metre tugboat ITTIR KAKTIR, built by RMK MARiNE and designed by Devlin Boat, in the "Best New Power Yacht" category of the annual Classic Boat Award.


2020

2020

The keel laying of NB122 yacht was performed on December 29th 2020.

The shipbuilding contract of 4.700 dwt Chemical tanker, NB123 we will build for Sogestran Shipping became effective on December 24th 2020.

The steel cutting of NB122 yacht we will build for our North America client took place on December 21st 2020.

RMK MARINE delivered T.DAMLA-8, 70 TbP tugboat successfully to DİTAŞ A.Ş., on January 31st, 2020.


2019

2019
RMK MARINE launched T.DAMLA-9 Tugboat successfully on 20th of December 2019.

RMK MARINE launched T.DAMLA-9 Tugboat successfully on 20th of December 2019.

RMK MARINE delivered T.ELINOR on December 18th, 2019 successfully.

RMK MARINE delivered COSIMA PG successfully on 20th November 2019.

RMK MARINE launched T.DAMLA-8 successfully on 18th October 2019.

RMK MARINE launched COSIMA PG successfully by a ceremony conducted on 12th June 2019.

RMK MARINE delivered T.ADALYN to DİTAŞ A.Ş., on May 28th, 2019 by fulfilling all contractual requirements successfully.

RMK MARINE launched T.ELINOR, 16.000 dwt chemical tanker, the second of the 2 tanker project being realised for DİTAŞ A.Ş.,successfully on 28th of March 2019.

RMK MARINE performed the first steel cutting activity of T.DAMLA-8, 70t Bollard Pull Tug Boat (Hull Number NB 117) on 15 January 2019


2018

2018
The Keel Laying of Cosima PG, a 7,000 Dwt Chemical/Oil tanker, being built for Pritchard Gordon Tankers Ltd (Hull Nr.116) has been performed successfully on 13th of November 2018, in accordance with the production calendar

The Keel Laying of Cosima PG, a 7,000 Dwt Chemical/Oil tanker, being built for Pritchard Gordon Tankers Ltd (Hull Nr.116) has been performed successfully on 13th of November 2018, in accordance with the production calendar.

RMK MARINE has launched T.ADALYN.successfully by a ceremony conducted on 18th of October 2018.

RMK MARINE has delivered LILY PG successfully and earlier than her contractual delivery date to its distinguished client Pritchard Gordon Tankers (PGT) Ltd on 1st of October 2018.

The first steel cutting ceremony of NB116, the 7.000 Dwt IMO II Chemical and Oil Products Tanker to be built and delivered to PGT,  took place in RMK MARINE on 26th of July 2018 as planned. 

RMK MARINE has launched LILY PG,  the 7.000 Dwt IMO II Chemical and Oil Products Tanker with stainless steel cargo tanks (Hull Nr. NB115)  being built for Pritchard Gordon Tankers (PGT) Ltd.,  successfully, by a ceremony conducted on 17th of April 2018. 

RMK MARINE has delivered BIT HERO, 7.760 dwt asphalt tanker, successfully to Tarbit Shipping AB (TBS) on 19th March 2018. 

The Shipbuilding Contract signed with Pritchard Gordon Tankers (PGT) Ltd for building and delivery of 1x7.000 dwt IMO II Chemical/Oil Tanker  became effective as of 12th  January 2018. 



2017

2017
The first steel cutting activity of 1x 16.000 dwt Chemical Tanker (Hull Number NB 114) to be built for a local client was performed on November 14, 2017 as planned previously.

The first steel cutting activity of 1x 16.000 dwt Chemical Tanker (Hull Number NB 114) to be built for a local client was performed on November 14, 2017 as planned previously. RMK MARINE has delivered 7.760 Dwt Asphalt Tanker BIT ECO (NB105) successfully to its distinguished client Tarbit Shipping (TBS AB) on 20th October 2017.

The Keel Laying of Lily PG, a 7,000 Dwt Chemical/Oil tanker with stainless steel cargo tanks, being built for Pritchard Gordon Tankers Ltd (Hull Nr.115) has been performed successfully on 12th of September 2017, in accordance with the production calendar and with the participation of the Owners.

RMK MARINE has delivered ROSE PG successfully and timely to its distinguished client Pritchard Gordon Tankers (PGT) Ltd on 12th of September 2017.

RMK MARINE has launched BIT HERO successfully by a modest ceremony conducted on 12th of July 2017.

The first steel cutting activity of 1x 15.000 dwt Asphalt/Oil Products Tanker (Hull Number NB 113) to be built for a local client was performed on June 21, 2017 as planned previously.

The first steel cutting ceremony of LILY PG, (Hull Nr.NB115) IMO11 Chemical Tanker of 7000 dwt with stainless steel cargo tanks to be delivered to PGT took place in RMK MARINE on 13th of June 2017.

Besiktas RMK MARINE Wheelchair Basketball Team has become champion for a subsequent second year, in 2016-2017 season too.

 RMK MARINE has launched ROSE PG successfully by a modest ceremony conducted on 25th of February 2017.

 RMK MARINE has launched BIT ECO successfully by a small ceremony conducted on 17th of January 2017.


2016

2016
RMK MARINE-Pritchard Gordon Tankers (PGT) Shipbuilding Contract signed on 19th of October 2016, for building and delivery of a second 7.000 Dwt Chemical Tanker became effective as of 11th of November 2016 and the Project has begun.

The second of the two 21 BpT Tug Boats built for DITAS as part of the 9 boats package was delivered to the Owner on 23th of June 2016, after achieving all the Owner’s requirements at sea trials, including a 12 kts service speed.

The first of the two 21 BpT Tug Boats built for DITAS as part of the 9 boats package was delivered to the Owner on 27th of May 2016, after achieving all the Owner’s requirements at sea trials, including a 12 kts service speed.

The Keel Laying Ceremony of Rose PG, a 7,000 Dwt Chemical/Oil tanker being built for Pritchard Gordon Tankers Ltd (Hull Nr.107) has been performed successfully on 18th of May 2016.

The fourth of the 5 Mooring Boats built for DITAS A.S. as part of the 9 boats package was delivered to the Owner on 14th of April 2016 and the fifth on 25th of May 2016.

The first steel cutting activities of 1x 7.000 dwt Chemical/Oil tanker Rose PG (Hull Number NB 107) to be built for Pritchard Gordon Tankers Ltd (PGT) was performed on March 15, 2016 as planned previously.

The second of the 2 Service Boats built for DITAS A.S. as part of the 9 boats package was delivered to the Owner on 26th of February 2016, after achieving all the Owners’ requirements at sea trials, including a 16 knot service speed.

The third of the 5 Mooring Boats built for DITAS A.S. as part of the 9 boats package was delivered to the Owner on 15th of February 2016.


2015

2015
The first of the 2 Service Boats built for DITAS A.S. as part of the 9 boats package was delivered to the Owner on 30th of December 2015, after achieving all the Owners’ requirements at sea trials, including a 16 knot service speed.

The first of the 2 Service Boats built for DITAS A.S. as part of the 9 boats package was delivered to the Owner on 30th of December 2015, after achieving all the Owners’ requirements at sea trials, including a 16 knot service speed.

The first steel cutting activities of 2x 9.400 Dwt Bitumen/asphalt tankers (Hull Numbers NB 105 and NB 106) to be built for Tarbit Sipping AB were performed on October 27, 2015 as planned previously.

The first of the 5 pcs of Mooring Boats with a 9.25 m length to be built for DITAS A.S. was delivered following the successfull completion of the sea trials performed on 01st of October  2015 and the second on 27th of November 2015after achieving all the Owners’ requirements at sea trials, including a 9 knot service speed. 

RMK Marine signed a newbuilding contract with Tarbit Shipping A.B, a major European ship-owner for 2+2 7,760 DWT IMO II Asphalt/Bitumen Carrier Tankers (12th June 2015).

RMK Marine signed a newbuilding contract with a major European ship-owner for 1 concrete +1 optional 7,000 DWT IMO II Chemical Tanker (27th May 2015).

Permanent Delivery of Coast Guard Vessel TCSG YASAM was realized on 22nd May 2015.

Steel cutting processes of  the 2 pcs 21 BpT of Tug Boat, 2 pcs of Service Boats with 14.9 m length and 5 pcs of Mooring Boat with 9.25 m length were commenced on 1st April 2015, to be built for DITAS A.S.

First asphalt tanker T.AYLIN was delivered on 20th March 2015.


2014

2014
Permanent Delivery of Coast Guard Vessel TCSG GÜVEN was realized on 18th December 2014

Permanent Delivery of Coast Guard Vessel TCSG GÜVEN was realized on 18th  December 2014

RMK Marine started the project on 31st October 2014 within the scope of the signed contract with DITAS Denizcilik AS a contract, for 2 pcs Tug Boat with 21 BpT pulling power, 2 pcs of Service Boat with 14.9 m length and 5 pcs of Mooring Boats with 9,25 m length. 

First asphalt tanker T.ESRA with a 19,000 Dwt capacity was delivered on 24th  August 2014.

Permanent Delivery of Coast Guard Vessel TCSG DOST was realized on 15th July 2014.

T.AYLIN, second ship of the asphalt tanker class was launched on 24th June 2014.

Former Head Assistant General Manager Mr. Adnan NEFESOGLU was appointed as the General Manager of our Shipyard on 6th June 2014.

Temporary Delivery of Coast Guard Vessel TCSG YASAM was realized on 30th April 2014.

Permanent Delivery of Coast Guard Vessel TCSG UMUT was realized on 16th April 2014.

“T.ESRA”, first of the world’s two greatest asphalt tankers having independent cargo tanks built by RMK Marine was launched on 20th January 2014.


2013

2013
Temporary Deliveries of Coast Guard Vessels

Temporary Delivery of Coast Guard Vessel TCSG GÜVEN was realized on 20th November 2013.

Temporary Deliveries of Coast Guard Vessels TCSG DOST and TCSG UMUT were realized on 4th April 2013.


2012

2012
RMK Marine became the gold sponsor for the World Superyacht Awards to held in Istanbul for years 2012 and 2013.

RMK Marine became the gold sponsor for the World Superyacht Awards to held in Istanbul for years 2012 and 2013.

The superyachts, Sarafin and Karia, were awarded with the Judges Commendation in their respective categories in the World Superyacht Awards 2012. Also, Sarafin and Karia were nominated as finalists for the Showboat International Design Awards 2012.

The third vessel of the Coast Guard Search and Rescue project, TCSG Yasam, was launched.


2011

2011
The first vessel of the Coast Guard SAR project successfully completed its first sea trial.

The first vessel of the Coast Guard SAR project successfully completed its first sea trial.

The third vessel of the Coast Guard SAR project was launched.

The first of the series of superyachts built for Oyster, Sarafin, was launched and delivered.

The 45 meter long high technology superyacht, Karia, was launched and delivered.


2010

2010
Nazenin V was awarded with Judges Commendation in the Best Sailing Yacht above 45 meters category inWorld Superyacht Awards

Nazenin V was awarded with Judges Commendation in the Best Sailing Yacht above 45 meters category inWorld Superyacht Awards

The first and second vessel of the Coast Guard SAR project were launched. RMK Marine was the mair sponsor for the 3rd Naval Systems Seminar.


2009

2009
T.Gönül was delivered.

T.Gönül was delivered.

The infusion technique, used by few shipyards in Turkey and in the world, has been successfully executed for the Oyster superyachts, making it the largest amount of resin infused in a single shot; applied to the Guinness Book of Records.

The Multipurpose Offshore Construction Vessel, North Sea Giant, was launched and delivered. 

The 52 meter long sailing superyacht Nazenin V, was launched and delivered.


2008

2008
As the biggest vessel of its kind, the Multipurpose Offshore Construction Vessel, North Sea Giant´s steel cutting ceremony took place.

As the biggest vessel of its kind, the Multipurpose Offshore Construction Vessel, North Sea Giant's steel cutting ceremony took place.

RMK Marine delivered the tugboats, T.Damla 2T.Damla 3 and T.Damla 4, that it constructed for Tüpras.

Barbarica was delivered whose construction started in 2008.

The Coast Guard SAR project was officially commenced with the participation of the Prime Minister of Turkey.

The tankers, T.Sevgi and T.Gönül built for Tüpras were launched.

T.Sevgi was delivered.


2007

2007
RMK Marine signed a cooperation agreement with Oyster Marine to build superyachts for Oyster.

RMK Marine signed a cooperation agreement with Oyster Marine to build superyachts for Oyster.

RMK Marine was awarded the contract to build 4 Coast Guard Search and Rescue Vessels for the Turkish Coast Guard, making this project the largest military contract undertaken by the private industry in Turkey.RMK Marine launched the third 19.000 DWT chemical tanker, Barbarica RMK Marine launched the first and second of the four tugboats that it is building for Tüpras. The chemical tankers, Chantaco and Chiberta were delivered.


2006

2006
The 34 meter long superyacht was launched and delivered.

The 34 meter long superyacht was launched and delivered.

Caressa K was awarded the International Design Award in 23-43 mt. category by the International Superyacht Society (ISS) in 2006.

The chemical tankers, Bergen Star and Kunsvik, were launched and delivered.


2005

2005
The 37 meter long superyacht Caressa K was launched and delivered.The chemical tanker, Guyenne was delivered.

The 37 meter long superyacht Caressa K was launched and delivered.The chemical tanker, Guyenne was delivered.


2003

2003
The 36 meter long superyacht Jasmin was launched in 2002, and delivered in 2003.

The 36 meter long superyacht Jasmin was launched in 2002, and delivered in 2003.

The 36 meter long superyacht Jasmin, was launched in 2002, and delivered in 2003. Jasmin was ed by International Boat as one of the best 10 superyachts of 2003.

The 36 meter long superyacht Private Lives was launched and delivered.


1997

1997
Acquired by Turkey’s largest conglomerate Koç Holding Started developing its technical capabilities by keeping abreast of technological advances.

Acquired by Turkey’s largest conglomerate Koç Holding Started developing its technical capabilities by keeping abreast of technological advances.

The 4420 DWT’ Laila Theresa, built that year, became the first IMO2 chemical tanker with stainless steel cargo tanks.


1984

1984
Moved to its current location in Tuzla.

Moved to its current location in Tuzla.


1978

1978
The shipyard was founded in Haliç, Istanbul to construct boats in steel, aluminum, and composite.

The shipyard was founded in Haliç, Istanbul to construct boats in steel, aluminum, and composite.